GT Home : : Campus Maps : : GT Directory

Status of the Joe cluster

This entry was posted by on Monday, 21 February, 2011 at

As many of you have noticed already, we have finished our integration of the two halves of Joe.  All nodes now have the same set of software, based on RHEL5, and receive their work from the same scheduler.  The “joe.pace.gatech.edu” and “neojoe.pace.gatech.edu” names refer to the same machine, they are no longer different.

Please see our user guide page [1] on queue names for the full list of queue names available to the Joe cluster.  Generally speaking, you probably want to be using the queue named “joe” along with as accurate as possible description of wall clock time, processors and memory requirements.  The scheduler will do the hard work of placing your job on the right resources to complete as soon as possible.

Thanks!

[1] http://share-it.gatech.edu/oit/pace/user-guide/the-job-scheduler/queue-names

Comments are closed.